This book details how Building Information Modelling is being successfully deployed in the planning, design, construction and future operation of the Istanbul New Airport, a mega-scale construction project incorporating a varying mix of infrastructures including terminals, runways, passenger gates, car parks, railways and roads. The book demonstrates how Airport Building Information Modelling (ABIM) is being used to:
• facilitate collaboration, cooperation and integrated project delivery
• manage subcontractors and eliminate cost over-runs
• reduce waste on site and enhance overall quality
• connect people in a virtual environment to encourage collaborative working
• provide clients with an effective interface for lifecycle management including: design development, construction documentation, construction phases and BIM and Big Data Integration for future facilities management
The book presents a best practice BIM project, demonstrating concurrent engineering, lean processes, collaborative design and construction, and effective construction management. Moreover, the book provides a visionary exemplar for the further use of BIM technologies in civil engineering projects including highways, railways and others on the way towards the Smart City vision. It is essential reading for all Built Environment and Engineering stakeholders.
This book details how Building Information Modelling is being successfully deployed in the planning, design, construction and future operation of the Istanbul New Airport, a mega-scale construction project incorporating a varying mix of infrastructures including terminals, runways, passenger gates, car parks, railways and roads. The book demonstrates how Airport Building Information Modelling (ABIM) is being used to:
• facilitate collaboration, cooperation and integrated project delivery
• manage subcontractors and eliminate cost over-runs
• reduce waste on site and enhance overall quality
• connect people in a virtual environment to encourage collaborative working
• provide clients with an effective interface for lifecycle management including: design development, construction documentation, construction phases and BIM and Big Data Integration for future facilities management
The book presents a best practice BIM project, demonstrating concurrent engineering, lean processes, collaborative design and construction, and effective construction management. Moreover, the book provides a visionary exemplar for the further use of BIM technologies in civil engineering projects including highways, railways and others on the way towards the Smart City vision. It is essential reading for all Built Environment and Engineering stakeholders.
Prisen for levering afhænger af typen af dit medlemskab, eller om du ikke har et medlemskab.
Hvis du ikke har et medlemsskab er priserne som følger:
Levering til pakkeshop | 39,95 kr. pr. ordre |
Hjemmelevering | 59,90 kr. pr. ordre |
Med et guldmedlemsskab er leveringspriserne:
Levering til pakkeshop. Ordrer under 250 kr. | 34,95 kr. pr. ordre |
Levering til pakkeshop. Ordrer over 250 kr. | 24,95 kr. pr. ordre |
Hjemmelevering. Ordrer under 250 kr. | 59,90 kr. pr. ordre |
Hjemmelevering. Ordrer over 250 kr. | 49,90 kr. pr. ordre |
Med et plating- eller streaming medlemsskab er leveringspriserne:
Levering til pakkeshop. Ordrer under 250 kr. | 24,95 kr. pr. ordre |
Levering til pakkeshop. Ordrer over 250 kr. | 0 kr. pr. ordre |
Hjemmelevering. Ordrer under 250 kr. | 44,90 kr. pr. ordre |
Hjemmelevering. Ordrer over 250 kr. | 19,95 kr. pr. ordre |
Bemærk venligst, at vi forbeholder os retten til at ændre i et fragtbeløb efter ordreafgivelse, hvis man som kunde har opnået en særlig fragtpris pga. køb for over 250 kr. og efterfølgende retter i sin ordre, så ordrebeløbet kommer under 250 kr. Ovenstående fragtpriser for ordrer under 250 kr. vil i så fald være gældende.
Levering
Varerne sendes indenfor 1-6 hverdage. Den konkrete leveringstid står oplyst ved hver enkelt vare. Levering sker med PostNord eller DAO distribution. Vi leverer kun i Danmark og ikke til Grønland og Færøerne.
Vær opmærksom på, at DAO ofte leverer om natten, og at der ikke skal kvitteres for modtagelse af pakken fra DAO. Hvis ikke DAO kan levere pakken forsvarligt ved dør eller i postkasse,
vil pakken i stedet blive leveret til nærmeste pakkeshop, også selvom du har betalt for hjemmelevering.