Hurtig levering
Fremragende Trustpilot
Op til 20% Rabat på nye medlemsordrer
Kurv
Assessment of the Results of External Independent Reviews for U.S. Department of Energy Projects
SPAR
kr 20
Peer review is an essential component of engineering practice and other scientific and technical undertakings. Peer reviews are conducted to ensure that activities are technically adequate, competently performed, and properly documented; to validate assumptions, calculations, and extrapolations; and to assess alternative interpretations, methodologies, acceptance criteria, and other aspects of the work products and the documentation that support them. Effective peer reviews are conducted in an environment of mutual respect, recognizing the contributions of all participants. Their primary objective is to help the project team achieve its goals. Reviews also contribute to quality assurance, risk management, and overall improvement of the management process. The U.S. Department of Energy (DOE) conducts different types of peer reviews at the different stages of a project, including reviews to assess risks and other factors related to design, safety, cost estimates, value engineering, and project management. Independent project reviews (IPRs) are conducted by federal staff not directly affiliated with the project or program and management and operations (M&O) contractors. External independent reviews (EIRs) are overseen by the Office of Engineering and Construction Management and conducted by contractors external to the department. EIRs are the primary focus of this report. However, the committee found that, in many cases, IPRs are explicitly used as preparation for or as preliminary reviews prior to EIRs. Thus, because IPRs are integral to the review process in DOE, they are also discussed because they might have an effect on EIRs. In October 2000, DOE issued Order 413.3, Program and Project Management for the Acquisition of Capital Assets (DOE, 2000). The order established a series of five critical decisions (CDs), or major milestones, that require senior management review and approval to ensure that a project satisfies applicable mission, design, security, and safety requirements: approve mission need, approve alternative selection and cost range, approve performance baseline, approve start of construction, and approve start of operations or project closeout. Assessment of the Results of External Independent Reviews for U. S. Department of Energy Projects summarizes the results. Table of ContentsFront MatterSummary1 Introduction2 Characteristics of Effective External Independent Reviews3 Criteria for Structuring Review Programs4 Conclusions, Findings, and RecommendationsA Biographies of Committee Members and ConsultantB EIR Documents Reviewed by the CommitteeC Summary Notes of a Workshop on DOE EIRsD Acronyms and Abbreviations
Eksklusiv medlemspris 249 kr
Medlemspris 251 kr
Eksklusiv medlemspris og medlemspris er kun for medlemmer. Du bliver automatisk medlem når du køber til eksklusiv medlemspris eller medlemspris. Få 7 dages gratis medlemskab (herefter automatisk 89 kr/30 dage). Læs mere om fordelene
Gratis fragt
23 - 25 hverdage
10 kr
Lavt pakkegebyr
Normalpris 269 kr
Fragt: 59 kr
23 - 25 hverdage
20 kr
Pakkegebyr
Spar 20 kr
Se vores konkurrenters priser her
God 15.835 anmeldelser på
Peer review is an essential component of engineering practice and other scientific and technical undertakings. Peer reviews are conducted to ensure that activities are technically adequate, competently performed, and properly documented; to validate assumptions, calculations, and extrapolations; and to assess alternative interpretations, methodologies, acceptance criteria, and other aspects of the work products and the documentation that support them. Effective peer reviews are conducted in an environment of mutual respect, recognizing the contributions of all participants. Their primary objective is to help the project team achieve its goals. Reviews also contribute to quality assurance, risk management, and overall improvement of the management process. The U.S. Department of Energy (DOE) conducts different types of peer reviews at the different stages of a project, including reviews to assess risks and other factors related to design, safety, cost estimates, value engineering, and project management. Independent project reviews (IPRs) are conducted by federal staff not directly affiliated with the project or program and management and operations (M&O) contractors. External independent reviews (EIRs) are overseen by the Office of Engineering and Construction Management and conducted by contractors external to the department. EIRs are the primary focus of this report. However, the committee found that, in many cases, IPRs are explicitly used as preparation for or as preliminary reviews prior to EIRs. Thus, because IPRs are integral to the review process in DOE, they are also discussed because they might have an effect on EIRs. In October 2000, DOE issued Order 413.3, Program and Project Management for the Acquisition of Capital Assets (DOE, 2000). The order established a series of five critical decisions (CDs), or major milestones, that require senior management review and approval to ensure that a project satisfies applicable mission, design, security, and safety requirements: approve mission need, approve alternative selection and cost range, approve performance baseline, approve start of construction, and approve start of operations or project closeout. Assessment of the Results of External Independent Reviews for U. S. Department of Energy Projects summarizes the results. Table of ContentsFront MatterSummary1 Introduction2 Characteristics of Effective External Independent Reviews3 Criteria for Structuring Review Programs4 Conclusions, Findings, and RecommendationsA Biographies of Committee Members and ConsultantB EIR Documents Reviewed by the CommitteeC Summary Notes of a Workshop on DOE EIRsD Acronyms and Abbreviations
Se mere i:
Produktdetaljer
Sprog: Engelsk
Sider: 74
ISBN-13: 9780309106399
Indbinding: Paperback
Udgave:
ISBN-10: 0309106397
Kategori: Fysik
Udg. Dato: 10 maj 2007
Længde: 0mm
Bredde: 279mm
Højde: 216mm
Oplagsdato: 10 maj 2007
MEDLEMSFORDELE
GRATIS FRAGT
SPAR OP TIL 90%
Andre har også købt
BOG (INDBUNDET)
Eksklusiv medlemspris kr 380

kr 499
Normalpris
kr 392
Medlemspris
SPAR
kr 119
BOG (HÆFTET)
Eksklusiv medlemspris kr 189

kr 280
Normalpris
kr 198
Medlemspris
SPAR
kr 91
BOG (INDBUNDET)
Eksklusiv medlemspris kr 183

kr 270
Normalpris
kr 192
Medlemspris
SPAR
kr 87
BOG (INDBUNDET)
Eksklusiv medlemspris kr 220

kr 320
Normalpris
kr 230
Medlemspris
SPAR
kr 100
BOG (INDBUNDET)
Eksklusiv medlemspris kr 214

kr 320
Normalpris
kr 225
Medlemspris
SPAR
kr 106
BOG (INDBUNDET)
Eksklusiv medlemspris kr 919

kr 1.499
Normalpris
kr 977
Medlemspris
SPAR
kr 580
BOG (INDBUNDET)
Eksklusiv medlemspris kr 203

kr 300
Normalpris
kr 213
Medlemspris
SPAR
kr 97
BOG (HÆFTET)
Eksklusiv medlemspris kr 154

kr 229
Normalpris
kr 162
Medlemspris
SPAR
kr 75
BOG (PAPERBACK)
Eksklusiv medlemspris kr 166

kr 201
Normalpris
kr 170
Medlemspris
SPAR
kr 35
BOG (HÆFTET)
Eksklusiv medlemspris kr 154

kr 229
Normalpris
kr 162
Medlemspris
SPAR
kr 75
BOG (HÆFTET)
Eksklusiv medlemspris kr 199

kr 300
Normalpris
kr 209
Medlemspris
SPAR
kr 101
BOG (INDBUNDET)
Eksklusiv medlemspris kr 239

kr 329
Normalpris
kr 248
Medlemspris
SPAR
kr 90
BOG (INDBUNDET)
Eksklusiv medlemspris kr 132

kr 149
Normalpris
kr 134
Medlemspris
SPAR
kr 17
BOG (INDBUNDET)
Eksklusiv medlemspris kr 208

kr 299
Normalpris
kr 217
Medlemspris
SPAR
kr 91
BOG (HARDBACK)
Eksklusiv medlemspris kr 25

kr 227
Normalpris
kr 45
Medlemspris
SPAR
kr 202
BOG (HÆFTET)
Eksklusiv medlemspris kr 149

kr 249
Normalpris
kr 159
Medlemspris
SPAR
kr 100
BOG (HÆFTET)
Eksklusiv medlemspris kr 152

kr 199
Normalpris
kr 157
Medlemspris
SPAR
kr 47
BOG (INDBUNDET)
Eksklusiv medlemspris kr 329

kr 499
Normalpris
kr 346
Medlemspris
SPAR
kr 170
BOG (INDBUNDET)
Eksklusiv medlemspris kr 329

kr 499
Normalpris
kr 346
Medlemspris
SPAR
kr 170
BOG (INDBUNDET)
Eksklusiv medlemspris kr 199

kr 300
Normalpris
kr 209
Medlemspris
SPAR
kr 101
Vi anbefaler også
BOG (PAPERBACK)
Eksklusiv medlemspris kr 209

kr 262
Normalpris
kr 214
Medlemspris
SPAR
kr 53
BOG (PAPERBACK)
Eksklusiv medlemspris kr 919

kr 1.239
Normalpris
kr 951
Medlemspris
SPAR
kr 320
System.Threading.Tasks.Task`1[System.Threading.Tasks.VoidTaskResult];